Power plant Layyah, blocks 7 and 8, 75 MW

Country: United Arab Emirates

Customer: Sharjah Electricity, Water and Gas Authority (SEWA), in cooperation with Yokogawa Middle East & Africa B.S.C.(c)

Scope of delivery: Reconstruction of TG7 and TG8 blocks supplied by Ansaldo (75 MW), hydraulic turbine control system. Replacement of the original control system. A combination of a BR actuator control block with redundant LVDT position control is used. Speed ​​measurement by six independent speed sensors.

Design, assembly, disassembly, supervision, testing and putting into operation

Realization: 2017