Power plant Balikpapan at refinery Block V, Pertamina, 8,4 to 12,8 MW

Country: Indonesia

Customer: PT PERTAMINA, in cooperation with Emerson Process Management Asia Pacific

Scope of delivery: Reconstruction of blocks TG1 to TG6 delivered by Siemens (8,4–12,8 MW), hydraulic control turbine system. Replacement of original control system. Use of combination of control block with EH convertor and redundant position feedback LVDT. Equipped with newly installed turbine protection – Trip block Invelt (SIL3). Speed measurement with six independent speed sensors.

Design, assembly, disassembly, supervision, testing and putting into operation

Realization: 2014 – 2021