Country: Czech republic
Customer: C – Energy Planá, s.r.o.
Scope of deliveries:
Turn-key project consisting of following parts:
Part 1: Installation of one cogeneration unit (with one gas engine, power output 11,5 MWe) and one container cogeneration unit (power output 0,528 MWe). The scope of delivery includes complete engineering, engineering documentation, supply of equipment, I&C and electrical part, output of power, erection, testing and commissioning.
Part 2: Demolition and dismantling of existing equipment for which no further use is intended.
Term of realization: 2022 – 2024, the equipment has been delivered and is currently being installed and then put into operation